The Hindu·3 min read·medium
Hydel generation taken up at Jurala with flood from Karnataka
T
The Hindu Bureau
✦AI Summary
Hydel power generation has commenced at the Jurala and Lower Jurala projects following a delayed arrival of monsoon floodwaters. Current water levels remain significantly lower than the previous year, impacting overall storage capacity.
Hydel generation at Jurala Hydro-Electric Station and at Lower Jurala Hydro-Electric Project has commenced on Monday night, almost two months late compared to last year, as the Jurala reservoir started getting some notable flood from the upstream only from the early hours of Sunday.
environmenteconomyscience
✦
Get the full story
Sign up for Headlinne to unlock AI insights, political bias analysis, and your personalized news feed.
Create free accountAlready have an account? Sign in